Previous consultations
We undertook a number of consultations so far in the preparation of the Site Allocations Document. Allocations Plan is no longer progressing, the files are provided below for historical record.
Several consultations were undertaken for the Minerals and Waste Local Plan Part 2: Site Allocations Plan.
Work on the production of the Site Allocations Plan has now ceased.
The files below provide a historical record of consultations undertaken during the production of the Site Allocations Plan.
- Oxfordshire MWLP Sites Plan Interim Sustainability Appraisal (SA) of the Approach to Site Delivery (pdf format. 473 KB)
- Oxfordshire MWLP Sites Plan Interim Sustainability Appraisal (SA) of the Approach to Site Delivery – Non-Technical Summary (pdf format)
- Updated Site Assessment Methodology - January 2021 (pdf format)
- Oxfordshire Minerals and Waste Local Plan: Part 2 Site Allocations Plan - Consultation Draft (pdf format, 2.8Mb)
- Report of Site Assessments (prepared by Adams Hendry and Oxfordshire County Council) (pdf format, Kb)
- Preliminary Draft Sustainability Appraisal/Strategic Environmental Assessment (pdf format, 1.6Mb)
- Habitats Regulations Assessment of the Oxfordshire Minerals and Waste Plan Part 2 (AECOM) (pdf format, 1.5Mb)
- Strategic Flood Risk Assessment – Addendum Report (AECOM) (pdf format, 545Kb)
- Strategic Flood Risk Assessment Figure 1 (pdf format, 6.3Mb)
- Strategic Flood Risk Assessment Figure 1A (pdf format, 4.3Mb)
- Strategic Flood Risk Assessment Figure 1B (pdf format, 4.7Mb)
- Strategic Flood Risk Assessment Figure 1C (pdf format, 5.2Mb)
- Strategic Flood Risk Assessment Figure 1D (pdf format, 5.3Mb)
- Strategic Flood Risk Assessment Figure 1E (pdf format, 4.8Mb)
- Strategic Flood Risk Assessment Figure 2 (pdf format, 6.3Mb)
- Strategic Flood Risk Assessment Figure 2A (pdf format, 4.1Mb)
- Strategic Flood Risk Assessment Figure 2B (pdf format, 4.6Mb)
- Strategic Flood Risk Assessment Figure 2C (pdf format, 5.1Mb)
- Strategic Flood Risk Assessment Figure 2D (pdf format, 5.2Mb)
- Strategic Flood Risk Assessment Figure 2E (pdf format, 4.7Mb)
- Strategic Flood Risk Assessment Figure 3 (pdf format, 6.7Mb)
- Report on Consultation (pdf format, 2Mb)
- Consultation Notice (pdf format, 230Kb)
- Additional Site Nominations Consultation document (pdf format, 777Kb)
- The Issues and Options consultation document (pdf format, 7.2 MB)
- Sustainability Appraisal Scoping Report (pdf format, 6Mb)
- Site Assessment Methodology and Sustainability Appraisal Report on Initial Consultation (pdf format, 2Mb)