Frequently asked questions about Didcot infrastructure improvements
Why is the scheme needed?
The Didcot and surrounding areas major infrastructure scheme will provide vital transport infrastructure to reduce congestion and enable more reliable journey times, improve pedestrian and cycling connectivity, and support new employment sites and housing in and around Didcot.
The project includes four highway sections that incorporate improvements to existing roads, the construction of new roads, new walking and cycle routes, and will help to facilitate new and enhanced bus services.
What are the key benefits of the scheme?
- 19km of walking and cycling paths to improve pedestrian and cycle connectivity for work and leisure trips
- 18 new bus stops to provide more sustainable travel options in and around Didcot
- Reduce congestion and improve air quality in surrounding villages and parishes as well as an alternative route across the River Thames
- Enable more jobs in the local area in new and existing employment sites
- Support expected housing growth in the local area
Is planning consent required?
The Secretary of State for Housing, Communities and Local Government granted planning approval for the scheme in December 2024.
Is the project funded?
The project is fully funded. Funding for the scheme comes from a combination of grants from Homes England, Enterprise Oxfordshire capital investment, Section 106 contributions from developers and funds from the council’s own capital budget.
What improvements works are planned to take place?
The project will see the following delivered:
- A dual carriageway along the A4130 east of the A34 Milton Interchange
- A new single carriageway road and three-span Science Bridge, over the railway and Milton Road
- A new single-carriageway link road between the A4130 at Didcot and the A415 at Culham, which includes two new bridges. One bridge will go over the Appleford Railway sidings, the other will be over the River Thames
- A new single carriageway link road between the A415 at Culham and the B4015 to the north of Clifton Hampden
Land acquisition – do you have all the land required?
The Secretary of State for Transport confirmed the decision on statutory orders needed to secure the land required for the scheme in July 2025. We're working to reach private agreements with affected parties where possible.
Most of the land has been acquired and the remaining few required land parcels will be in place shortly. The confirmed statutory orders give us compulsory purchase powers if we are unable to reach a private agreement.
Will there be any road closures, including to any Public Right of Way (PRoW), during construction?
Yes, some closures are anticipated.
Most of the work will take place away from, or alongside, the main network to maintain existing traffic flows and have as minimal impact as possible. However there will be some disruption and road closures, especially when the new roads connect to the existing network.
Closures are anticipated on the A4130, Milton Road and B4016. Specific timings and details of these closures and traffic management arrangements will be advised in advance, along with any relevant diversion routes, via our website and the project newsletter.
Sections of the Appleford PRoW and the Clifton Hampden PRoW are closed until September 2027. Signed diversion routes are in place for both.
We also have to close a section of the Thames Path, between Culham lock and the weir to the north of Long Wittenham. This is so we can safely construct the new viaduct that crosses the river Thames. This is scheduled to take place from September 2026 for approximately 18 months. A signed diversion route is in place.
Will you need to close the River Thames to river traffic?
Yes, there will be certain points, when we are lifting the new bridge decks into place, that river traffic will be temporarily suspended from using the watercourse. This is for the safety of both our workforce and the public. These closures are likely to take place during spring 2027. Specific timescales and further details will be notified in advance of the work taking place on both our monthly newsletter and webpage.
What is the impact on traffic going to be?
We will be working hard to minimise disruption as much as possible. Any temporary traffic management measures used will be continually monitored throughout each day of construction, so that we can respond quickly to traffic conditions as they happen.
For the latest updates on road delays, planned roadworks or incidents that could affect your journey around Oxfordshire, visit https://one.network.
We also have a dedicated WhatsApp Travel channel which you can follow.
How will construction traffic access and leave the site?
Construction traffic will access the works sites via specific works access points. There are several constructions compounds across the entire project. Wheel washing facilities are be provided at the points of exit to minimise the impact on the existing road network.
Will the road be street lit?
Yes. Once the road is complete, the lighting will be LED type and will be directional, eliminating light spill beyond the road surface. The lighting will also be reduced to 50% power late at night to reduce carbon.
What is the timescale of the construction programme?
The project will be delivered in stages:
| Activity | Works Commence | Status |
|---|---|---|
| Stage 1 – enabling works | Autumn 2025 – Spring 2026 | Complete |
| Stage 2 – construction starts | Spring 2026 | Underway |
|
Stage 3 – construction complete and road open: Clifton Hampden Bypass Didcot Science Bridge Didcot to Culham River Crossing
|
Spring 2028 Autumn 2028 Spring 2029 |
These timescales and plans are subject to weather conditions and other factors that are beyond the council’s control. The timescales may also be impacted by works undertaken by developers who may also be working in the same location.
When is the scheme expected to be complete?
Construction will take place between spring 2026 and Spring 2029.
Will there be noise, vibration and/or dust during construction?
Yes, due to the nature of the work, there will be noise and dust during construction. but this will be minimised as much as practically possible. It will also be monitored regularly where construction occurs nearby to villages. However, we will ensure that water suppression is used to keep dust to a minimum and noisy works will be undertaken sensitively during daytime hours where possible.
Will any vibration impact nearby properties?
We don’t expect it to impact properties. Vibration will be monitored through a live feed and regularly reviewed.
What type of construction techniques are you using for the piling work?
We are using a number of techniques to create the piles for the bridges and for the roundabout on the B4016. These include:
- CFA (continuous flight auger) piling - this involves using a long spiral drill to bore down into the ground to create a hole, which is then filled with concrete, and a steel cage is then placed into the wet concrete to give each pile extra strength.
- Rotary piling – this method uses a large rig with a spiral drill, to create a deep hole. A temporary steel tube in then placed within the hole to hold the soil in place, before a steel cage is lowered in. Concrete is then poured in and the steel is removed, leaving a solid concrete pillar under the ground.
- Displacement piling - a technique that uses a drilling tool to push soil aside and compact it. The holes created by the drill are then filled with concrete.
- Sheet piling - a construction technique that involves driving interlocking steel, vinyl, or wood sheets into the ground to create a continuous barrier.
We are using these techniques because all significantly reduce the typical noise and vibration created from traditional pile driving works.
Will there be any night-time work?
There may be times when we need to work overnight, especially when the new roads connect onto the existing network. We will keep residents informed of these times and works and seek to mitigate any noise disturbance where possible. Details of this will be made available via our website and the project newsletter.
Will there be any interruptions to utility provisions?
No, we do not anticipate any disruption to utility provisions. However, there will be other works taking place in the same vicinity, by other developers, which may impact service. We have plans in place to mitigate any disruption from our scheme, as much as possible
What about archaeology?
A planning condition ensured that before any construction work took place archaeological investigations were undertaken. These excavations were undertaken by both Oxford Archaeology and Cotswold Archaeology and involved the overburden strip, excavation and recording of any findings.
A full report of the investigations for all three sections of the scheme will be available in approximately 9-12 months:
- For Clifton Hampden Bypass and Didcot Science Bridge via the Oxford Archaeologies Knowledge Hub
- For Didcot to Culham River Crossing via Cotswold Archaeology’s report portal
What are the environmental benefits of the scheme?
The project has been developed to be as sustainable as possible in terms of its impact on the environment. We’ve set specific sustainability targets on the design and build (including additional temporary impacts during construction). We will be using sustainable urban drainage systems as a core part of our design and through careful design and planning we are aiming to increase biodiversity by a minimum of 10% across the scheme area. The scheme is expected to not only reduce congestion and improve air quality, but also help reduce noise impacts to over 700 existing homes.
Several hundred trees and other vegetation will be planted as part of the landscaping for the completed scheme. This will include a mix of meadow grassland, semi mature native trees such as black alder, field maple, lime, silver birch, and shrubs such as elder, wild privet, blackthorn and hawthorn. The planting and landscaping plan has been designed to improve biodiversity and will complement existing habitats.
Also, as part of the scheme, a number of mitigations to increase habitats for birds, small mammals, reptiles, and invertebrates will be installed.
During construction, all site offices and construction plant will, where possible, use biodiesel and solar energy as well as recycled materials to reduce the environmental impact of the works.
Where possible, we will also aim to reduce carbon emissions from the construction through fuel use, land clearance, transport of workers and materials, and embodied emissions from materials. We will also use innovative low carbon construction methods and recycled materials where possible and utilise creative landscaping and planting to further help absorb carbon.
How is OCC considering the environmental impact of the planned improvements?
As a responsible council, we have undertaken a full arboricultural investigation and environmental assessment, as well as developed ecological method statements and construction and environmental management plans. This is all to ensure that we minimise and mitigate our impact.
What are you doing to mitigate the removal of any tress and vegetation?
A scheme of new planting will be undertaken within the correct planting season upon completion of the works.
Several hundred trees and other vegetation will be planted as part of the landscaping for the completed scheme. This will include a mix of meadow grassland, semi mature native trees such as black alder, field maple, lime, silver birch, and shrubs such as elder, wild privet, blackthorn and hawthorn. The planting and landscaping plan has been designed to improve biodiversity and will complement existing habitats.
A Landscaping Enhancements Fund has been set up to support local communities impacted by the loss of vegetation during construction. Local communities can apply to the fund for additional landscaping work.
Will the scheme increase the risk of flooding?
Consideration of flooding is a fundamental part of the scheme’s objectives. We will be using sustainable urban drainage systems and the new bridge over the Thames provides a more resilient route over the river, when existing bridges flood.
A flood compensation area (FCA) is being provided, to offset any loss in flood capacity. The FCA is an area of land away from the road, which provides a storage facility in the event of a flood to compensate for land taken to build the road. The area will be fenced and landscaped and wildlife encouraged through the design of landscaping.
What type of pedestrian and cycle crossings will there be across the schemes?
We will be using a mix of crossings, both controlled and uncontrolled. Our public exhibition boards provide details of the crossing for each of the sections of the scheme.
Will existing bus stops be affected during construction and if yes, where will temporary ones be located?
Yes.
For the Clifton Hampden Bypass scheme, there is currently a temporary bus stop along the A415 westbound near the Culham Campus. The temporary location of this will change, as we make progress and switch the traffic management around in the area.
Currently there are no bus stops affected by the construction works for the River Crossing or Didcot Science Bridge.
What is the width of the proposed cycle and footway?
This varies across the scheme. Our public exhibition boards provide cross-sections for each section of the scheme, with further details.
Will there be changes to speed limits during and after construction?
- A4130 Widening: 40mph
- Science Bridge: 30mph
- River crossing: 40mph at the southern end, 50mph elsewhere
- Clifton Hampden Bypass: 40mph at the southern end, 50mph elsewhere
What will the emergency services do?
Emergency services will have access at all times.
What will happen to the construction access upon completion of the works?
Construction access points and site compound areas will be cleaned and cleared and replanted upon completion and any fencing will be reinstated.
Will the contractor/s be using local subcontractors?
It is Oxfordshire County Council policy to use local sub-contractors where possible.
Will the contractor employ apprentices?
It is Oxfordshire County Council policy to ensure that each project employs apprentices where possible.
Will there be any different coloured surfacing to distinguish the cycle and footways from the road?
No – both will have normal tarmac surfacing. The cycle and footways will be segregated from the road.
What about satellite navigation?
Upon completion of the works, it is normal practice for Oxfordshire County Council to notify the main sat nav providers, such as Google, Waze and TomTom about the road improvements.
How do I find out about the traffic management or keep up to date on project progress?
For regular updates on project progress, including traffic management details, subscribe to our dedicated project newsletter by visiting this webpage: http://eepurl.com/joLfjg
The project webpage on the OCC website will also be regularly updated as the project progresses.
How can I ask a question, request further details, or make a complaint/comment?
If you have any construction-related queries or concerns, you can contact our contractors directly:
VolkerFitzpatrick (Didcot Science Bridge)
07385 517608
dsbenquiries@volkerfitzpatrick.co.uk
GRAHAM (River Crossing and Clifton Hampden Bypass)
02895 071 034
civilscustomerrelations@graham.co.uk
Alternatively, if your query relates to the project as a whole or its wider implications, you can email the project delivery team at HIF1project@oxfordshire.gov.uk